How to Choose a Chicago Kitchen and Bathroom Remodeling Company for a Complete Home Update

The right company for a complete kitchen and bathroom update puts design, permitting, and construction under one written contract. It holds an active license, shows finished kitchens and bathrooms, and gives you realistic timelines. Abbott Builders Inc. does all of this for homeowners in St. Charles and nearby Chicago-area communities, with more than 30 years of remodeling experience.

What Should a Complete Home Update Contract Include?

A complete home update contract should be in writing and signed before work starts. It should state the total cost and itemize parts and materials. It should also name who handles design, permits, and construction, and list exactly which rooms and finishes are covered. Abbott Builders puts all of that under one contract.

The paperwork matters. The Illinois General Assembly publishes the Home Repair and Remodeling Act, which says that for covered work costing more than $1,000, the contractor must give the customer a written contract or work order to sign before work begins. That document must state the total cost and reasonably itemize parts, materials, and any estimate charge.

A vague proposal that says "kitchen and baths, one price" gives you nothing to compare. Ask each company for the itemized version.

Check the License and Insurance Before You Compare Prices

Licensing in Chicago has an expiry date built in. The City of Chicago Department of Buildings states that a Chicago general contractor license is valid for one year from issuance. It is automatically inactivated if the associated insurance policy expires.

So a license number alone proves very little. Ask any contractor you're considering to show a license that is active today, then confirm the insurance behind it is current.

Do this before you spend hours on design. It takes ten minutes and removes bad options early.

Why Does One Contractor for Both Kitchen and Bathrooms Matter?

One contractor handling kitchen and bathrooms keeps plumbing, electrical, tile, cabinetry, and scheduling in one plan. Your finishes match from room to room, one person answers your calls, and the sequence of work is set once. At Abbott Builders, a single team runs the whole project from consultation to final walkthrough.

Kitchens and bathrooms share the same trades. Both need plumbing updates, electrical work, and careful material selection. When separate firms handle each room, the plumber, the electrician, and the tile crew may be booked twice by two different people. Gaps and delays tend to show up in the handoffs.

A typical scenario: a homeowner in St. Charles wants a new kitchen layout, a refreshed primary bath, and a finished basement. With one contractor, the plan covers all three, the budget is set in one conversation, and the order of work is decided up front.

What We Do in a Kitchen and Bathroom Update

Abbott Builders Inc. has handled kitchens, bathrooms, and basements since 2003, and the scope below is what a complete update covers.

Kitchen remodeling Bathroom remodeling
Typical duration 4 to 8 weeks 2 to 4 weeks
Design support Layout planning, cabinetry design, material selection Clean layout, tailored storage, efficient planning
Core work Layout, storage, finishes Layout, fixtures, finishes, plumbing and electrical updates
Popular choices Cabinetry, countertops, energy-efficient appliances Walk-in showers, double vanities, built-in storage, water-saving fixtures
Optional extras Smart-home features: lighting, climate control, security, entertainment Updated sinks, showers, and toilets

Duration depends on size, scope, plumbing updates, custom materials, and fixture availability. Your consultation gives you a timeline for your own house.

Our kitchen gallery and bathroom work show the finishes we install most often. These include quartz countertops, custom cabinetry, custom tile, frameless glass shower enclosures, and brushed nickel fixtures.

How Long Does a Whole-Floor Kitchen and Bathroom Update Take?

Abbott Builders typically completes a kitchen remodel in 4 to 8 weeks and a bathroom remodel in 2 to 4 weeks. Your total depends on size, scope, plumbing changes, custom materials, and fixture availability. We set the schedule for your house during the free consultation, including whether rooms run together or one after another.

Plan for disruption. Your kitchen will be out of use for a portion of most projects. Many families set up a temporary coffee and microwave station in another room before demolition starts. Bathrooms are shorter jobs, so if your home has a second full bath, we can often keep one usable while the other is under construction.

Reface or Replace: The Cabinet Decision

Cabinets are the biggest line in most kitchen budgets, so the choice matters.

Refacing works best when cabinet boxes are solid and the current layout still supports daily needs. Replacement makes more sense when cabinets have water damage, sagging, repeated alignment problems, poor storage, or a layout that no longer works.

We tell homeowners which category their cabinets fall into during the site visit, before any numbers go on paper.

Extending the Update Beyond Kitchen and Bath

Many homeowners start with one room and keep going. Abbott Builders Inc. also provides:

Most basement remodels require a permit, especially when walls, plumbing, or electrical work are added. We handle that permitting as part of the project. For basement floors we recommend moisture-resistant vinyl plank, tile, or sealed concrete.

A complete home update often reads as a phased plan. Kitchen and baths come first, then the basement or an addition once the budget is ready. We can price the full scope in one design conversation and build it in stages.

How Abbott Builders Works From First Call to Final Walkthrough

Manny Bucur founded Abbott Builders Inc. in 2003. He is a U.S. Marine Corps combat veteran, and the company is veteran-owned and operated. Our about page covers the team and how we work.

The process starts with a free remodeling consultation. We talk through your goals, budget, and timeline, then build a custom design and proposal. Estimates are based on your layout, goals, selections, a site visit, and a design consultation. That is how the numbers in your proposal tie to your actual house.

Our service areas page lists the communities we cover. If you own a condo, our guide on how to choose a condo remodeling contractor in Chicago covers building rules and permits in more detail. More general questions are answered on our FAQs page.

Frequently Asked Questions

Can I remodel my kitchen and bathroom at the same time?

Yes. Many homeowners combine them because both rooms share plumbing, electrical, and finish decisions. Combining saves planning effort and keeps materials consistent. The trade-off is living without a working kitchen and possibly a bathroom for a stretch. We map the sequence during consultation so you know which rooms are usable at each stage.

What does the free consultation cover?

The consultation covers your goals, budget, and timeline. From there, we develop a custom design and proposal. Detailed estimates come from your layout, selections, a site visit, and a design consultation. It costs nothing, and you leave with a clear view of scope and sequence for your project.

Which communities does Abbott Builders serve?

We serve homeowners in St. Charles, Illinois and nearby Chicago-area communities. Our service areas page lists the current coverage. If your town isn't listed, call (630) 935-7722 and we will tell you whether we can take the project.

When can I reach your office?

Our listed hours are 9:00 a.m. to 5:00 p.m. seven days a week. You can call (630) 935-7722 to book a consultation, or use our contact page.

Tell us which rooms you want updated, what your timeline looks like, and whether a basement or addition might follow. Use the short form below this article and we'll get back to you with next steps for your kitchen and bathroom plan.

Start your kitchen and bathroom update

We handle design, permitting, and construction under one contract, with a free consultation to start.

What are you planning?

How soon?

We will come back to you with next steps for a free consultation.